1. You find an abnormal part during the machine operation, what should you do? (Select all that apply)
2. It is OK to pass a dimensionally NG part if you know the customer cannot find it.
3. A machine abnormal occurs which resulted in many broken tools. After long downtime and tool changes, it’s OK to skip part quality confirmation after tool change and run parts.
4. While visually inspecting a part you find a defect that isn’t allowed per the boundary standard, you should: (Select all that apply)
5. You’ve been asked to visually inspect a part you’ve never seen before and there are no documents posted on the VI stand – boundary standard, VI Work Instruction, or Working Points for Gauges. You should (Select all that apply)
6. After C/O, you notice the wrong kanbans and documents are posted at the machine line, you should (Select all that apply)
7. You noticed that a Pokeyoke Gauge was not working properly in your process, you decided to (Select all that apply)
8. All NG parts must be marked in red and contained to scrap.
9. During Visual Inspection, you find a part with missing machined holes. Since you marked the part and red and contained to scrap, there is no need to SCW for SV & QA.
10. During the visual inspection you find an easier/quicker way to inspect the part instead of following the posted Work Instruction. You Should (Select all that apply)